A shot showing the two left returns through the new holes in the top of the tank. I used a piece of PVC to wedge the returns in place securely, but allows me to remove them when I decide to ditch the SCWDs and hard plumb the returns in (we'll see how they do).
Here is a shot of the 1" return reduced to the 3/4" barb fittings for the vinyl tubing.
Here is the left side, a better view of the return and the barb fittings.
OK, That is all for tonight...I will get some more pictures up when the tank is full. The live rock is being cured as we speak, so two more weeks before picking that up! Thanks for reading. SWN